This European Standard provides execution procedures for excavating, transporting and placing soils and rocks for the construction of earth-structures and guidance for the work. Additionally, it includes excavation and placement of rock materials underwater.
Dredging of soils and the associated hydraulic placement of fills are covered by EN 16907-6 and EN 16907-7.
Execution of earthworks follows the conclusions of the earthworks design and optimization phase (EN 16907-1), which should anticipate soil and rock specificities and their suitability. In case some events could not be foreseen, additional design is performed during the execution of works.
Označení | ČSN EN 16907-3 (721017) |
---|---|
Katalogové číslo | 507038 |
Cena | 590 Kč590 |
Datum schválení | 1. 3. 2019 |
Datum účinnosti | 1. 4. 2019 |
Jazyk | angličtina (obsahuje pouze anglický originál) |
Počet stran | 88 stran formátu A4 |
EAN kód | 8596135070381 |
Norma byla zrušena k | 1. 7. 2024 |
a nahrazena | ČSN EN 16907-3 (721017) |
Dostupnost | skladem (tisk na počkání) |
ČSN EN 16907-1 (721017)
Zemní práce - Část 1: Zásady a obecná pravidla
ČSN EN 16907-2 (721017)
Zemní práce - Část 2: Klasifikace materiálů
ČSN EN 16907-4 (721017)
Zemní práce - Část 4: Úprava zemin vápnem a/nebo hydraulickými pojivy
ČSN EN 16907-5 (721017)
Zemní práce - Část 5: Kontrola kvality
ČSN EN 16907-6 (721017)
Zemní práce - Část 6: Rekultivace terénu materiálem těženým z vody
ČSN EN 16907-7 (721017)
Zemní práce - Část 7: Hydraulické ukládání minerálních odpadů